A daily pre-task plan and crew huddle book for construction, maintenance and field crews, with task steps, hazards and controls, PPE and permits, emergency information, crew sign-on, an end-of-shift review, and hazard and control prompts.
Plan the day's work with the crew before anyone starts. The two-page pre-task plan starts with the job, location, date, crew lead and today's work scope. Then it has six task-step rows, each with the hazards and the controls for that step and who is responsible.
Mark the PPE needed for the day and the permits or checks the work needs, such as hot work, confined space entry, digging, energy isolation, lifting, or work near power lines. The back of the plan has the emergency information (emergency number, site contact, address for responders, nearest hospital or clinic, assembly point, and where the first aid kit, AED, fire extinguisher and eyewash are), a 12-person crew sign-on, a record of changes during the shift, and an end-of-shift review for incidents, near misses, changes, lessons and open items.
Two pages of hazard and control prompts help the crew check for hazards they may have missed: falls, struck-by, caught-between, electrical, excavation, overhead work and lifting, hot work, confined spaces, silica and dust, noise, weather, chemicals, manual handling, mobile equipment, traffic, slips and trips, hand and power tools, and site-specific items. An open items log carries follow-ups to the next huddle, and a sign-on continuation page covers larger crews and visitors.
For construction work, it helps with OSHA's training rule, 29 CFR 1926.21(b)(2), by keeping a record of the crew going over the day's hazards and controls. It does not replace the training your employer must provide, and it is not an OSHA form. Regulation references are current as of this revision (Rev. Nov 2026). Regulations can change, so always check the current rule.
What's inside
Main 8-page Letter PDF (fillable and printable versions): cover, how to use it, two-page pre-task plan (6 task steps, PPE, permits and checks, emergency information, 12-person sign-on, changes during the shift, end-of-shift review), two pages of hazard and control prompts (18 groups), open items and follow-up log (10 entries), and crew sign-on continuation and visitors (20 rows)
4 single-sheet PDFs for quick printing
READ ME with printing and filling instructions, the license, and the regulation reference
Details
Format: PDF files in a zip, instant digital download
Paper: US Letter, print at 100% (actual size); print the plan back to back
Type into the fields and print, or print blank and fill in by pen on a clipboard. Signatures and initials are done by hand.
Written for most construction, maintenance and field crews. Add site-specific hazards and controls to the plan.
License: unlimited copies for use at the purchaser's own workplace(s). No resale, sharing or posting.
Revision: Rev. Nov 2026 (shown in the footer of every page)
How it works
1. Buy and download the zip. Unzip it first (Windows: Extract All; Mac: double-click).
2. Open the files in Adobe Acrobat Reader or a current browser (Chrome, Edge or Firefox). Click a box and type, then save a copy.
3. Or print blanks on Letter paper at 100% (Actual size) and fill in by pen. Print as many copies as you need for your own workplace.
Good to know
These sheets are a planning and record-keeping template. They are not legal advice and do not replace your employer's safety program, required permits, competent-person duties, or training. Your employer remains responsible for identifying hazards and protecting workers. VLG Industrial Signage Solutions is not responsible for any work, worksite or equipment, or for any injury, loss or penalty arising from use of these sheets. Anyone can stop work if something is unsafe or the job changes; re-huddle and update the plan before work starts again. Follow your site rules and the manufacturer's instructions.



























