An hour-meter preventive maintenance (PM) program for telehandlers. It includes a PM 1 to 4 schedule, a 3-page service checklist, a grease & boom log, an attachment PM sheet, a repair & follow-up log and a PM due tracker spreadsheet. Fits most makes, fixed-boom or rotating.
Plan each telehandler's PM by the hour meter, do the right checklist items at each service, and keep the grease, boom and repair records together. Every form can be typed into on screen or printed and filled in by pen.
Start with the how-to page. It explains the four PM levels and which sections apply to your machine.
The schedule page holds your manual's hours and months for PM 1 to 4 and a 15-line service history. The 3-page PM service checklist has 55 items in eight sections, plus 2 write-in lines. Each item shows its PM level and has OK, NEEDS REPAIR and N/A boxes and a follow-up number. The sections are:
engine, cooling and fuel
hydraulics
electrical
operator station, ROPS and safety devices
frame
boom, carriage and forks
axles, steering, tires and stabilizers
Electric machines mark the engine sections N/A. Lines marked (if fitted), such as stabilizers, boom chains and rotating parts, get N/A on machines that do not have them.
The grease & boom log has 17 rows for greasing, wear pad, chain and tire checks. The attachment PM sheet covers forks, buckets, jibs, hooks, grapples and other tools, with a separate section for hydraulic attachments. The repair & follow-up log numbers each repair from R-001 and up. It records the notification and work order numbers, whether the machine went out of service, and who released it back to work. The PM due tracker (.xlsx) shows the next PM due for each machine as OK, DUE SOON or OVERDUE, and keeps PM history and repairs.
For powered industrial trucks, OSHA 29 CFR 1910.178(q)(1) says a truck not in safe operating condition shall be removed from service. The repair & follow-up log helps with keeping a written record of each machine taken out of service and each repair. Checklist item 33 helps with checking that the capacity plate and load charts are in place and readable, which 1926.602(c)(1)(i) addresses for lift trucks on construction work.
OSHA treats many telehandlers used to handle material as rough-terrain or extended-reach forklifts, which are a type of powered industrial truck. Check which rules apply to your machines and your work.
This pack does not include the operator's daily pre-use check; keep using a daily pre-use checklist for it. Completing a page does not by itself show that an employer follows any rule.
Regulation references are current as of this revision (Rev. Nov 2026). Rules can change, so check current federal, state and local requirements before use.
What's inside
Main 9-page Letter PDF (printable and fillable):
cover
how to use this pack
PM schedule & service history
PM service checklist (3 pages, 55 items, PM levels 1 to 4)
grease & boom log
attachment PM sheet
repair & follow-up log
5 single-sheet PDFs for quick printing: PM schedule, PM checklist (3 pages), grease & boom log, attachment PM sheet, repair log
PM due tracker spreadsheet (.xlsx): machines, PM history, next PM due and repairs
READ ME (3 pages): how to fill in and print the forms, how the PM levels work, the license, and the rule text this pack helps with, with links to the official sources
Details
Format: PDF files and an .xlsx spreadsheet in a zip, instant digital download
Paper: US Letter, portrait. Print at 100% (actual size).
Type into the fields and print, or print blank and fill in by pen. Sign by hand.
Generic checklists that fit most makes: fixed-boom or rotating, diesel, gas or electric. Follow the manufacturer's manual for intervals, fluids, settings and wear limits.
License: unlimited copies for use by the purchaser's own company and its equipment. No resale, sharing or posting.
Revision: Rev. Nov 2026 (shown in the footer of every page)
Good to know
These sheets are a maintenance record template, not legal advice. They do not replace the manufacturer's manual, your company's procedures, or any rule that applies to your equipment. The checklists are general: some steps may not apply, and a machine may need other checks. A machine that is not safe goes out of service, and only authorized people make repairs and put it back in service. The pack does not cover the operator's daily pre-use check or operator training. Part names are generic; no equipment maker sponsors or endorses these sheets. VLG Industrial Signage Solutions is not responsible for the condition or operation of any machine, or for any injury, loss or penalty arising from use of these sheets.



























